Progress Updates

     
    March 23, 2007 Progress Update
       
    Upcoming Events
    Cabins Block Party: Saturday, June 2nd. Open house and block party. Invitation to follow.
    Concert: Hootie & The Blowfish. Saturday, July 21st. Pre-party at The Cabins. Concert hosted by Suncadia.
    Outdoor Movie: RV. Saturday, July 14th. Movie hosted by Suncadia.
     
    Car Barn Locations
    Please see the attached link to view your car barn location: LINK (Car Barn Locations)
     
    Cabin Bathrooms Update
    Master bath: The vanity countertop has been upgraded from limestone tile to a 3/4" thick limestone slab. The limestone is the same color and material as before. The only difference is a slab as opposed to tile.
    Upstairs baths: The upstairs vanity countertops have been upgraded from a yellow-colored tile to a 1 1/4" thick copper grey slate slab. The backsplash will be slate tile. The tub surround has been updated from a 6" x 6" yellow-colored tile to a 6" x 6" off-white colored tile. The shower tile is the same tile as the original, only the color has changed.
     
    ICS - Internet, Cable, Telephone
    ICS, Intelligent Community Services, Inc., is the internet/cable/telephone provider for Suncadia. Telephone and internet service is available at The Cabins site. Cable TV is anticipated to be available in late summer. See the attached flyer for information on services: LINK (Suncadia Rate Brochure.) Please contact Steve Daniels with ICS for additional information: (503) 972-7802 or steved@icsemail.net.
     
    Construction Progress
    Cabins 10, 11, 12, 13, 14, 15, 16, 18 and 21 are completely framed. Windows are installed in all of these units. Insulation has started in Cabin 10. Cabin 11 has been drywalled and is being painted. Insulation, drywall and painting are complete in Cabins 12, 13, 15 and 21. Doors and millwork have started in cabins 12 and 15 and is complete in Cabin 13. Cabins 2, 6, 7, 8 and 9 are framed through the second floor. Cabins 3, 19 and 20 are framed through the first floor. Cabins 4 and 17 have begun framing. Foundation and chimney for Cabin 5 is complete with a first floor deck and winter tarp installed. Foundations are complete for Cabins 1 and 34 with chimney work progressing.
     
    Post a Photo on the Cabins Website
    If you have taken a photo of yourself at your Cabin lately and would like to post it to the Cabins at Tumble Creek construction website, please email the photo to Anna: anna.lewison@opusnw.com.
     